Precautions for the complete set of equipment in the organic fertilizer production line after granulation
1. Before starting the organic fertilizer equipment: because the components of the new equipment have not been run in, the equipment needs to be heated up for the first time when starting, and the general requirement is 40-50 minutes. For specific operation, first raise the temperature to pull the triangle belt of the motor by hand until free, and then pull the motor continuously 8-10 times according to the normal working options. Let's continue to heat up for about 10 minutes.
2, after the boot temperature control: before the boot we have carried out a preliminary temperature control of organic fertilizer equipment, organic fertilizer production line in the production process of the material treatment, is determined by the characteristics of the material itself, so, after the boot also need to continue heating, because the normal production needs to continue to add heat; Adjust different temperatures according to different properties of plastics.
3, organic fertilizer production line normal work: normal work, machine temperature to maintain stable, do not fluctuate high and low. Near the vent hole, until the head part of the temperature to keep about 200℃. At this temperature, it is generally possible to have a good processing for most materials.
4. Stop the organic fertilizer production line: first of all, the power supply of the main engine should be cut off, and the head wire plug (with a wrench) of the equipment must be removed. Preheat separately before next use. When installing, be sure to pay attention to whether the host is perpendicular to the ground. After installation, first check whether the screws of the machine are loose and whether the door air box of the main engine compartment is tight. If they are loose, please strengthen them to avoid accidents.
Comments
Post a Comment